We carried out restoration work on two rooms with different floors, one with clay tiles. These are rather rare local clay tiles, no longer made and hence very precious. I scrubbed the tiles, then treated them with a waterproofing solution, awaiting now a final polish and waxing. Lots of elbow grease.

2016-05-04 10.06.00 2016-05-04 10.06.21 2016-05-04 10.06.27

2015-06-05 19.01.24 2015-06-05 19.00.55

Almost finished

Almost finished

2015-06-01 15.39.48 2015-06-01 15.39.28 2015-06-01 15.39.20

Setting down the cement layer with a border, before the final mosaic tiles

Setting down the cement layer with a border, before the final mosaic tiles

The  second room with Venetian mosaic was done professionally in the Spring of 2015.  Here are a few image of the artisan’s work, really outstanding job.